Day four at BISA. People hang out at lunch time. It is a small school with one to one classes. I had my pre test today. It went pretty well. Tim morning is the real test.
On Monday I went for a walk, then Pilates, then to replace the faucet, unclog a sink, replace a switch, and then go to the Norweigen men's choir. As maintenance projects go I need return as the shut off valve is broken and it causes reduced pressure to the sink. I ordered the part and said I would return. It was the board meeting at the choir. I had not completed all the things I needed to do. I have to get them done this week. A letter, minutes. I would also like to put together a short summary of the cod fish dinner. I think it will be important to have for next year. We need to get the date on the calendar for events, and to put them out on the website. People put events on the calendar early. We are singing on Wednesday for a erlings brother' celebration of life. That will be interesting. We practiced a couple of songs
Two years ago I agreed to sell a lot so a house could be built. The builder had to get permits and go through a reason use permit process. I was by there this week and the notice sign was installed. I hope it will start this year. I went to the property because the tenants of the house next to it had an electrical problem.
I have been using a service to change the lock combinations and send out information regarding the short term stay. The locks used z wave and required a hub to work. The hub is a smart things hub, which I have , and seems to be still working with my samsung phone. Because I had a couple of locations for short term rentals I had several hubs. I see on my phone four different hubs. I know that only one is in use. A second one is connected to the Internet but it is off line. I am a bit confused. I have been messing around with this for a couple of days. There is always a learning curve with technology.